Home Engineering Literature Contact Us Install List Search Page  

R. A. Nichols Engineering

Vapor Recovery &

Combustion Specialists

 

 

 

Equipment
1 Stage VRU
2 Stage VRU
Vapor Burners
Portable Burners
Vapor Holders
Equalizers
Burner Booster

 

 

Kinder Morgan, Mission Valley CA,  38.7’ x 26.1’H Vapor Bladder

Vapor Bladder Low Level

Bladder is filling, ring has lifted off floor, but has not lifted weights yet.

Vapor Bladder Side Fabric

Side fabric rolls in as the vapor space fills and ring rises.

Vapor Bladder Almost Full

Vapor space is almost full, ring is near roof, side fabric is extended.

Vapor Bladder Floating Ring

Top and side fabric bolt to ring, as well as harness and static cables.

Vapor Bladder Center Plate

Bladder gauge and static cables attach to center plate.

Vapor Bladder Stabilizing Harness

Stabilizing harness lifts as the ring rises, keeping it from tipping.